CB/T3594 E Type is listed as a float-type air-pipe head for marine water tanks. The page covers the published DN50–DN350 range without splitting pages by nominal size; final dimensions and connections follow the project requirements.
Key information for selection. Send your drawing or nameplate photo for an exact match.
| Item | Value |
|---|---|
| Standard | CB/T3594 |
| Type | E type float air-pipe head for water tanks |
| Nominal size | DN50–DN350; split by drawing range, not separate product identity |
| Pressure | Project-specific |
| Body material | Project-specific |
| Connection | Project-specific |
| Media | Marine water-tank venting and air-pipe service; confirm actual tank duty |
| Inspection & certificates | CCS · LR · BV · ABS · DNV · ZC |
| Part | Material | Trademark |
|---|---|---|
| Body and cover | Project-specific | Per project requirements |
| Disc / plug / stem | Project-specific | Per project requirements |
| Gasket and seat | Project-specific | Per project requirements |
The customer catalogue lists CB/T3594 E Type water-tank air-pipe heads in DN50–65 and DN80–350 ranges. The physical photographs show red float-type heads with flanged bases and side protective or ventilation housings; they do not establish the exact float, screen, material or connection details for a selected size.
Provide the tank service, nominal size, deck location, pipe connection, venting requirement, weather protection and maintenance clearance. We select the E-type configuration from the approved tank and deck drawing rather than treating the two size ranges as separate procurement identities.
Nominal size alone does not create a separate procurement identity. The E-type structure is kept together, while the final size, dimensions and connection are confirmed from the drawing.
State CB/T3594 E Type, nominal size, water-tank service, connection, protection requirement, material and required inspection documents.
Yes. Send the pipe size, deck drawing, fixing details and an old product photograph. The connection, height and cover arrangement must be checked before supply.
State the tank medium, venting duty, pipe size, deck location and any fire, weather or class requirement. Unconfirmed details are agreed against the project requirements.